Print Document

Features

Peninsula Link incorporates 27 kilometres of freeway with two traffic lanes in each direction. There are on and off ramps to 11 roads, including three freeway-to-freeway connections and 35 bridges.

Around 1.5 million trees and plants line the freeway, requiring 80,000 cubic metres of mulch. A 25 kilometre shared walking and cycling path winds through wetlands, parklands and natural bushlands.

Click on the menu items to the left for more information about Peninsula Link, including:

  • Shared use path
  • Public art
  • Noise walls
  • Bridges and structures
  • Landscaping
  • Pavement